Let's talk

PV Kabeljauwbeek solar park

A first-of-its-kind hybrid site: solar and wind on one location.

Hybrid solar + wind NetherlandsEneco
Excavator digging a cable trench beside a wind turbine, with workers in safety gear

The challenge

New features (cable cooling, shared grid infrastructure, biodiversity integration) and many parties to coordinate.

What we did

Tight interface coordination between Eneco, the EPC contractor and all parties: aligned schedules, managed risk and kept execution predictable.

The result

A resilient, future-focused renewable asset delivered successfully.