Windpark Ze-Bra

One integrated baseline across three EPC packages.

Onshore wind NetherlandsEneco
Wind turbine foundation under construction, with turbines in the background, Windpark Ze-Bra

The challenge

Three parallel packages (civil and foundations; electrical and grid; turbine supply and commissioning), plus decommissioning of the existing Windpark Anna-Maria Polder, which has to line up with commissioning to protect revenue.

What we did

We act as the integrating force across all workstreams: maintaining the integrated baseline and managing the interfaces.